Course of construction
Construction is carried out in new buildings and adaptations of existing buildings in basements or on lower floors, if the building has no basement. The Massivprim safety reinforcement elements are welded together, formworked and poured with high strength concrete to integrate them into the building. The construction is permanent and cannot be relocated at a later date. The installation time of the safety reinforcement elements is significantly shorter than that of the static reinforcement and all other construction works, so that the Massivprim system does not have a significant impact on the extension of the construction time of buildings.
We can provide a vault room with wall and floor linings, lighting and additional installations as an additional service.